Search

PASCHAL formworks at Frankfurt terminal project

In the construction of the new terminal in Frankfurt, the contractor is using circular column formwork from PASCHAL

Renovation of Downstream Reservoir

PASCHAL formwork and supporting jacks are involved in the renovation of the downstream reservoir on the Sösetalsperre dam in the Harz mountains. Renovation of this reservoir outlet is one element of the complete renovation of the downstream reservoir.

Shaft backfilling with climbing formwork system

RAG worked with the experts from PASCHAL to develop a completely new climbing formwork system specifically for use in shafts.

Fast Forming Times

Using Paschal systems, the reinforced concrete work for two new bridges for the Barntrup bypass is going well, as the road and rail traffic will be flowing smoothly soon.

PASCHAL?s new webshop goes online

PASCHAL has re-launched its newly designed webshop (www.formwork-shop.com) offering both visual and technological changes and fresh content.

PASCHAL to exhibit for second time at Excon

PASCHAL will be presenting the practical application possibilities and system diversity of its formwork systems to visitors at Excon 2019 at booth B23 in hall 4.